FREE TOOL

Capacity & Quota Planner

Does the headcount plan actually produce the number? Capacity with ramp built in, quota calibration, and a comp sanity check, one connected model.

YOUR DATA NEVER LEAVES YOUR BROWSER. FILES ARE PARSED LOCALLY, NOT UPLOADED, STORED, OR TRANSMITTED.

BEST EXPERIENCED ON DESKTOP.

Target $10MModelled capacity $3.1MGap $6.9Mshort

Models save and load as local JSON files. Nothing is stored on a server.

Rep roster

NameRoleStartRamped $/month

Monthly capacity grid

RepJulAugSepOctNovDecJanFebMarAprMayJun
Existing MM AE 1$59.5K$58.5K$57.5K$56.5K$55.5K$54.5K$53.5K$52.5K$51.5K$50.5K$49.5K$48.5K
Existing MM AE 2$59.5K$58.5K$57.5K$56.5K$55.5K$54.5K$53.5K$52.5K$51.5K$50.5K$49.5K$48.5K
Existing ENT AE$109.1K$107.3K$105.4K$103.6K$101.8K$99.9K$98.1K$96.3K$94.4K$92.6K$90.8K$88.9K
New MM AE (Q2 hire)···$5.7K$13.9K$21.8K$29.4K$36.8K$43.8K$48K$49.5K$48.5K
New SMB AE (Q1 hire)·$6.8K$13.4K$19.8K$25.9K$31.8K$31.2K$30.6K$30K$29.5K$28.9K$28.3K
Total$228.1K$231.1K$233.8K$242K$252.5K$262.5K$265.7K$268.6K$271.2K$271K$268.1K$262.7K

Cell = fully ramped productivity x ramp % (role curve, start date) x attrition adjustment. Darker = more ramped.

Monthly capacity vs phased target

Total modelled capacity

$3.1M

Base scenario

Gap

$6.9M

equals 115.7 fully ramped MM AE months

Latest viable hire date

None

hiring 2 MM AEs cannot close this year's gap at any start date

Pipeline requirement

$12.2M

$1M/month creation at 25% win rate

Capacity / win rate

Where the plan disagrees with itself

Quotas exceed modelled capacity

Risk

Total quota is 101% of modelled capacity. Your plan requires everyone to beat their own ceiling.

Why it mattersCapacity, quota, and comp are one system. When they disagree, reps notice before finance does.

Do thisLower the calibration factor, add heads earlier, or lower the target. Pick one deliberately.

Quotas sum below the company target

Risk

Even if every rep hits 100%, the company misses.

Why it mattersCapacity, quota, and comp are one system. When they disagree, reps notice before finance does.

Do thisRaise quotas, add capacity, or lower the target. The math does not negotiate.

Capacity gap against target

Risk

Modelled capacity falls short of target, equal to 115.7 fully ramped MM AE months.

Why it mattersCapacity, quota, and comp are one system. When they disagree, reps notice before finance does.

Do thisNo in-year hiring plan closes this gap given ramp. Reset the target or find capacity in productivity.

Comp cost above benchmark

Watch

Comp cost at plan is 33.8% of bookings, above a ~12% benchmark for direct sales comp.

Why it mattersCapacity, quota, and comp are one system. When they disagree, reps notice before finance does.

Do thisCheck pay mix and quota-to-OTE ratios per role before touching rates.

Next step

This model with your actual historicals, segment win rates, and hiring pipeline is the first week of an At Pace planning engagement.

Book a Pipeline Diagnostic

METRIC DEFINITIONS: RAMP · OTE · QUOTA-TO-OTE RATIO · WIN RATE